Availability: | |
---|---|
Genghong
Product Description
In a steel plant, slag-free tapping during transfer of molten steel from the BOF to the ladle is necessary condition to produce ultraclean steel for applications.
The Slag control Mechanism is installed at the tap hole of the converter, preventing the slag by automatically closing and opening the tap hole.
Features:
Simple, rational, steady structure and safe process;
The close speed of gate:230mm≤1.2s;
Modular design for convenient installation and maintenance.
Parameters
Pictures